Progress of drywall installation getting completed
Mudding and sanding completed before paint
After photo of this bedroom, such a dramatic change with the trim getting painted white semigloss
This is the look of a drywall job that is complete, with sanding, dusting and vacuuming the walls
Prep work done in a 2000 sqft bungalow
This picture provides the before look with the base of the cabinets built in place
Custom cabinets built and completed before spraying gallery series Sherwin Williams Greek Villla
Completed cabinet job with custom cabinets built to the clients specs
Completed drywall and paint job in a basement stair well. Ceiling was too low, sprayed it flat black
Completed drywall and paint job done in a basement stairwell. Painted Benjamin Moore Distant Gray.
Walls were painted with Sherwin Williams Touch of Sand and trim was painted with white semi gloss.
Bathroom was painted with Sherwin Williams Gardenia with the trim getting painted white semi gloss
Containment done before getting rid of the textured ceiling
Beautiful flat ceiling giving the kitchen a modern vibe
Drywall installation, client had a leak in the upstairs washroom which led to demo in the bedroom
Dramatic change from finished drywall to paint and baseboard work
Updating closet by taking out the old bifold doors and installing 2 panel doors
Took out the old cracking plaster and installed new drywall
Finished closet with a beautiful custom built in with 2 rods maximizing the space
Look of a basement staircase before boxing in the columns and installing the railing
Beautiful finish of these boxed columns and wonderful oak railings with steel decorative spindles
2x4 frame work completed for built in tv unit
Shiplap and 1x2 cut and installed before the built in tv unit was sprayed with graco paint sprayer
Custom built in tv unit built with ship lap with a 1x2 border and a custom matt black mantle
Before picture of prep work getting completed before treads and risers get installed
Feature stair case where we took up the old carpet and finished it with modern treads and risers
Prep work done before spraying this brick with Emerald Urethan White semigloss from Sherwin Williams
Completed job show casing the painted brick and flooring install
Prep work completed before painting ceiling flat white and wall colour Touch of Sand